Permits & Legal Requirements

Do You Need a Permit for Your Balcony Project?

In Montreal and most surrounding municipalities, a balcony project is rarely as simple as picking up tools and getting to work. In many cases, you are legally required to obtain a building permit before starting — even if the work seems minor from a visual standpoint.

A permit ensures that your balcony design meets structural, safety, and zoning regulations in accordance with the Quebec Construction Code and local municipal bylaws.

Permit Required When:

You must apply for a permit if you plan to:

  • Build a new balcony (any height or size).

  • Replace or enlarge an existing balcony, even if you use the same material.

  • Change structural supports (beams, columns, or anchoring systems).

  • Alter railing height, design, or material in a way that changes safety performance.

  • Change balcony location or add a new one where there wasn’t one before.

Permit May Not Be Required When:

Some small-scale, cosmetic repairs may be exempt from permitting:

  • Repainting, refinishing, or sealing without changing the structure.

  • Patching small cracks or replacing minor surface areas with identical materials.

  • Cleaning or power washing.

Important: Even for small repairs, certain boroughs still require notice or inspection. Always confirm with your borough permit office before starting — what’s exempt in one area may require approval in another.

Permit Costs (Montreal Example):

  • $9.80 per $1,000 of total work cost (materials + labor).

  • Minimum fee: ~$164.20 for residential properties.

  • Minimum fee: ~$482.50 for commercial or institutional buildings.

  • Additional fees may apply for expedited processing or additional inspections.

Why Getting a Permit Matters:

  • Avoids costly fines for unauthorized work.

  • Ensures your balcony meets safety codes, reducing liability risks.

  • Protects property value — unpermitted work can complicate future sales.

  • May be required by your insurance provider for coverage in case of an accident.

Borough-Specific Rules:

Regulations vary, but common thresholds include:

  • Balcony floor over 60 cm (24 in) above ground → permit required.

  • Balcony floor over 1 m (39 in) above ground → additional structural documentation from a licensed professional may be required (architect, engineer, or borough inspector approval).

  • Historic districts or designated heritage properties often have extra design restrictions and approval processes.

Permit Required When:

Building a new balcony.
Replacing or enlarging an existing balcony.
Changing structural supports or materials.
Altering railing height or design.

Permit May Not Be Required When:

Minor repairs

Without changing materials or dimensions (e.g., repainting, small patching)

Always confirm with your borough permit office to avoid fines.

Is Your Balcony Safe & Code Compliant?

Consultation Request